Abidjan-Lagos Corridor Highway Development Project

Abidjan - Lagos Corridor Highway Development Project LOGO.png

Abidjan-Lagos Corridor Highway Development Project

One Road, One Vision

We begin in 2025

Welcome

A catalyst for economic growth and integration of peoples of West Africa

The Abidjan-Lagos Corridor forms the first phase of the Dakar-Lagos Trans-West African Coastal Corridor (Trans-Africa Highway Number 7)

The Abidjan-Lagos Corridor forms the first phase of the Dakar-Lagos Trans-West African Coastal Corridor (Trans-Africa Highway Number 7), which is planned to link West Africa to Central and Eastern Africa (Dakar-Lagos-Yaounde-Bangui-Kampala-Nairobi to Mombassa. The Dakar-Abidjan-Lagos Corridor is a key priority project under the trans-African highway of the ECOWAS region, whose development is part of the Program for Infrastructure Development in Africa (PIDA). The Abidjan-Lagos section is located on the eastern-west coastal axis of the West African Region and covers five (5) ECOWAS Member Countries, namely Côte d’Ivoire, Ghana, Togo, Benin and Nigeria. It covers approximately 1,028 kilometers and has eight (8) border crossing points (four country-pair land borders). The current alignment of the corridor crosses all the major economic centers and capital cities of the five Member Countries from “Place de la République” in Abidjan and ends at Mile 2 (Eric Moore) in Lagos.

Upcoming Events

Upcoming Events

Event

STAKEHOLDERS CONSULTATION & VALIDATION WORKSHOP FOR THE SPATIAL DEVELOPMENT INITIATIVES STUDY (SDI) INTERIM REPORT

LOCATION: ACCRA, GHANA

DATE: 14TH TO 16TH MAY 2024

Event

STAKEHOLDERS CONSULTATION & VALIDATION WORKSHOP FOR THE SPATIAL DEVELOPMENT INITIATIVES STUDY (SDI) INTERIM REPORT

LOCATION: ACCRA, GHANA

DATE: 14TH TO 16TH MAY 2024

Event

STAKEHOLDERS CONSULTATION & VALIDATION WORKSHOP FOR THE SPATIAL DEVELOPMENT INITIATIVES STUDY (SDI) INTERIM REPORT

LOCATION: ACRRA, GHANA

DATE: 14TH TO 16TH MAY 2024

Event

STAKEHOLDERS CONSULTATION & VALIDATION WORKSHOP FOR THE SPATIAL DEVELOPMENT INITIATIVES STUDY (SDI) INTERIM REPORT

LOCATION: ACRRA, GHANA

DATE: 14TH TO 16TH MAY 2024

News

Accra-Ghana-pre-validation-workshop3

ABIDJAN-LAGOS CORRIDOR HIGHWAY NATIONAL LEVEL PRE-VALIDATION WORKSHOPS HOLDS IN MEMBER STATES

Accra, Abidjan, Lome, Cotonou, Lagos 18th, June 2024 - The Transport Directorate of the ECOWAS Commission is concurrently holding five ...

EXPERTS LAUD PROGRESS ON THE IMPENDING ABIDJAN-LAGOS HIGHWAY PROJECT AS ECOWAS CONCLUDES 3-DAY CONSULTATION AND VALIDATION WORKSHOP

The Economic Community of West African States (ECOWAS) Commission, in collaboration with the African Development Bank (AfDB) has organised a ...
Abidjan-lagos corridor member states and development partners set for industrial revolution in the region through the establishment of energy, strategic infrastructure and economic anchor projects

ABIDJAN-LAGOS CORRIDOR MEMBER STATES AND DEVELOPMENT PARTNERS SET FOR INDUSTRIAL REVOLUTION IN THE REGION THROUGH THE ESTABLISHMENT OF ENERGY, STRATEGIC INFRASTRUCTURE AND ECONOMIC ANCHOR PROJECTS

Lagos, Nigeria – 15 September 2023: Rising from the Validation Workshop for the Spatial Development Initiative (SDI) Scoping survey  for ...

Join Our Newsletter

Receive updates about the ALCHDP in your inbox.